   Beaverton Mandir Remodeling Project Status Page 1

 

As with any physical structure, pictures certainly tell the story better than words, so we'll be keeping you up-to-date with something of a photo album...

Early April 2005: In the Beginning...

April/May 2005: Preliminaries

(Page 2) Week of May 15th, Workday with Ananda Seattle members

(Page 2) Week of May 22nd: Preparation for Memorial Day Work Week

(Page 3) May 26-30th: Work Week with Ananda members nationwide

(Page 4) Week of May 29th: Follow-up

(Page 5) Continued Work, June 5th-24th

(Page 6) Installation of Lotus Window, July 7th

(Page 7) Insulation, Sheetrock, and Construction of Arches, July 20-23

(Page 8) Construction of Exterior Rooflines, July 24-30

(Page 9) Continued Rooflines plus August 13th Workday
(Page 10) Exterior Detailing & Venting, August 21-28
(Page 11) More Exterior Detailing, Walkway, and Interior Altar, August 29-Sept 9
(Page 12) Exterior Stucco, Oct 1 Workday
(Page 13) Interior Sheetrock & Painting, Stone Work, Door Installation, October
(Page 14) EMD's and Carpet
(Page 15) Altar Pictures and More
 

Early April 2005: In the Beginning...

 


The mandir as it appeared before remodeling began.

 

April/May 2005: Preliminaries


Cutting away the portion of the sanctuary roof that
extended to the ground.

 

 
Cutting up the front walkway concrete....and sections of the concrete inside the foyer
where new reinforced footings need to be poured.

 


Breaking up the front walkway.

 

next page >>

 