Mandir Remodeling Project Status Page 11
(Page 1) Early April 2005: In the
Beginning...
(Page 1) April/May 2005: Preliminaries
(Page 2) Week of May 15th, Workday with
Ananda Seattle members
(Page 2) Week of May 22nd: Preparation
for Memorial Day Work Week
(Page 3) May 26-30th: Work Week with
Ananda members nationwide
(Page 4) Week of May 29th: Follow-up
(Page 5) Continued Work, June 5th-24th
(Page 6)
Installation of Lotus Window, July 7th
(Page 7) Insulation, Sheetrock, and Construction of Arches, July 20-23
(Page 8) Construction of Exterior
Rooflines, July 24-30
(Page 9) Continued Rooflines plus August
13th Workday
(Page 10)
Exterior Detailing & Venting, August 21-28
More Exterior Detailing,
Walkway, and Interior Altar, August 29-Sept 9
(Page 12) Exterior Stucco, Oct 1 Workday
(Page 13) Interior Sheetrock & Painting,
Stone Work, Door Installation, October
(Page 14) EMD's and Carpet
(Page 15) Altar Pictures and More
More Exterior Detailing, Walkways, and Interior Altar, August 29-Sept 9
We're now really reaching into many finishing details! On the exterior, we
completed the concrete walkway and steps and prepared the entryway for
stucco. The middle part of the sanctuary wall is also covered with stucco
now!
On the inside, we completed our electrical panel upgrades, with PGE
hooking us back up on the 9th. We also had a great workday on Sept 4th
with more sheetrock going up and lots of work on the altar on that day and
the following week. It's really starting to have power!
Pouring the walkway


Preparing the entryway for stucco

Door trim (thanks to Bob) and sheetrock

Here you can see the electrical upgrades: the back breaker panel (left)
and the whole
incoming system outside (right). The large conduits on the right drop down
from the
power pole, go through the big box in the foreground (that's connected to
the meter),
then around the corner to the main shutoffs, then inside to the breaker
panel.

Altar Work



The
stucco on the exterior sanctuary wall, and the completed walkway