(Page 1) Early April 2005: In the
Beginning...
(Page 1) April/May 2005: Preliminaries
(Page 2) Week of May 15th, Workday with
Ananda Seattle members
(Page 2) Week of May 22nd: Preparation
for Memorial Day Work Week
(Page 3) May 26-30th: Work Week with
Ananda members nationwide
(Page 4) Week of May 29th: Follow-up
(Page 5) Continued Work, June 5th-24th
(Page 6)
Installation of Lotus Window, July 7th
(Page 7) Insulation, Sheetrock, and Construction of Arches, July 20-23
(Page 8) Construction of Exterior
Rooflines, July 24-30
(Page 9) Continued Rooflines plus August
13th Workday
(Page 10)
Exterior Detailing & Venting, August 21-28
(Page 11) More Exterior Detailing,
Walkway, and Interior Altar, August 29-Sept 9
(Page 12)
Exterior Stucco, Oct 1 Workday
(Page 13)
Interior Sheetrock & Painting, Stone Work, Door Installation, October
(Page 14)
EMD's and Carpet
Altar Pictures and More
Altar Pictures and More (up to December 18)
Just in time for
our first Christmas meditation we got the backlit altar pictures (and
spiritual eye) installed along with a rope-light in the recessed area that
produces a very nice effect. There's also been lots of work lately on
installing various pieces of trim and many other fine details that often
go unnoticed--so much so that there isn't much in the way of pictures to
share either!
Eric installing some lights, Dwight painting

David wiring up the altar picture backlights, Satyaki assembling the
pictures


Satyaki installing the ropelight and it's effect.

Jim doing a little surgery on the wall for the spiritual eye, and then
in it goes!

The altar as it now appears in its simplest form

|